1. Quick Snapshot: Stadium-Scale ELV Integration
● Project: Narendra Modi Stadium, Motera, Ahmedabad — the world’s largest cricket stadium.
● Main contractor: Larsen & Toubro Construction (Buildings & Factories).
● Cyber Group’s role: Supply, installation, testing and commissioning of ELV works.
● Systems delivered: data, voice and networking, video distribution, CCTV, DFMD (door frame metal detectors) and LPG/PNG leak detection.
● Outcome: L&T issued a completion certificate (dated 4 August 2021) confirming the work was completed, that they were satisfied with the performance and timely completion, and that the installed system was working in a satisfactory manner.
2. The Stadium Challenge: ELV Systems for the World’s Largest Cricket Venue
A stadium of this size behaves like a small city on match days. Tens of thousands of spectators, players, broadcasters, security teams and hospitality staff all depend on systems that most people never see. For the ELV contractor, that creates a few clear challenges:
- Scale: cabling, network and camera coverage spread across stands, concourses, entry gates, back-of-house areas and parking.
- Many systems, one timeline: data, voice, video, security screening and safety systems must be installed alongside civil, MEP and finishing work by other agencies.
- Zero tolerance on match days: security screening, surveillance and communication must work every time the gates open.
- Coordination with the main contractor: work has to follow the main contractor’s sequence, quality checks and handover process.
3. Inside Narendra Modi Stadium: Cyber Group’s ELV Scope
Working under Larsen & Toubro Construction, Cyber Group handled the supply, installation, testing and commissioning of the following ELV systems:
| System | Role in the stadium |
|---|---|
| Data & networking | Network backbone that connects offices, control rooms and ELV systems across the venue |
| Voice | Telephone communication for operations, administration and security teams |
| Video distribution | Distribution of video signals to screens across the venue |
| CCTV surveillance | Camera coverage for monitoring crowds, entry points and key areas |
| DFMD (door frame metal detectors) | Security screening of people at entry points |
| LPG/PNG leak detection | Early warning of gas leaks in areas that use LPG or PNG, such as kitchens and food outlets |
Data, voice and networking
Every other ELV system depends on a reliable network. A well-planned structured cabling and networking layer gives cameras, phones and screens a stable path back to the control rooms.
CCTV and video distribution
In a venue of this scale, CCTV helps security teams watch crowd movement, gates and sensitive areas, while video distribution carries content to screens around the stadium.
Security screening and gas safety
Door frame metal detectors at entry points support security screening of spectators and staff. LPG/PNG leak detection adds a safety layer in areas where cooking gas is used.
4. Why Mega Venues Choose a Single ELV System Integrator
- One point of responsibility for several low-voltage systems instead of many small vendors.
- Coordinated design and cabling, so data, voice, video and security systems share routes and racks cleanly.
- Testing and commissioning together, so systems are handed over working, not just installed.
- Experience on large, multi-agency sites, working within the main contractor’s schedule and quality process.
Cyber Group brings 25+ years of experience and 3,000+ projects as an ELV system integrator. See more of our success stories.
Conclusion
Narendra Modi Stadium is one of the most demanding venues in India. Delivering data, voice, networking, video distribution, CCTV, DFMD and LPG/PNG leak detection for it — and receiving a completion certificate from Larsen & Toubro Construction — reflects Cyber Group’s ability to execute large, multi-system ELV projects on time.
FAQs
Cyber Group carried out the supply, installation, testing and commissioning of ELV works — data, voice, networking, video distribution, CCTV, DFMD and LPG/PNG leak detection — at Narendra Modi Stadium, Motera, Ahmedabad.
The work was done for Larsen & Toubro Construction (Buildings & Factories), which issued the completion certificate.
L&T issued the completion certificate on 4 August 2021, confirming the work was completed and the installed system was working satisfactorily.
DFMD stands for Door Frame Metal Detector. It is a walk-through metal detector used to screen people at entry points.
Yes. Cyber Group designs, installs and integrates ELV systems for large venues, campuses and public infrastructure across India.